“Section 1 Clearance:” A certification that is issued by a licensed inspector when ALL items highlighted in Section 1 have been remedied. This may include chemical treatment to exterminate pests, as well as replacing damaged wood caused by infestation and/or dry rot.May 2, 2008
What is a Section 1 termite treatment?
Section 1 items typically fall into the closing costs for the seller, meaning sellers pay for these treatments. This includes the cost of remediation, like tenting or spraying to eliminate an active termite infestation. It also means paying for things like repair of dry rot or wood that has been chewed by termites.Nov 4, 2014
What is termite clearance California?
The Termite Inspection & Clearance This to make sure the house is free and clear of termites. If there is no evidence of termites, this is called having clearance and the lender will need to be provided with this information to satisfy the condition of the loan.Jun 8, 2020
What is a termite clearance report?
Letters of Clearance / Wood Destroying Insect and Organisms Report: Any statements as to the condition of a building pertaining to termites, or other wood destroying insects or decay fungi (Rot), other than a bid or proposal for treatment shall be considered a Letter of Clearance.May 28, 2019
What is Section 1 pest clearance?
“Section 1 Clearance:” A certification that is issued by a licensed inspector when ALL items highlighted in Section 1 have been remedied. This may include chemical treatment to exterminate pests, as well as replacing damaged wood caused by infestation and/or dry rot.May 2, 2008
What is a Section 1 item on a termite report?
Section 1 Items mean that there is actual evidence of termites, dry rot, or fungus - today. This means that the inspector went in, touched it, smelled it, or what have you. The problem currently exists in the dwelling, so it has to be addressed right away. Therefore, it will go on the report under Section 1.Sep 9, 2021
Does VA require Section 2 termite clearance?
The VA requires all Section 1 work to be completed. ... The VA allows the underwriter to make a judgement call for Section 2 work. Normally the rule is if the problem is a health or safety issue they need to call for the work to be done.Aug 6, 2018