For a 10-yard truckload of ready-mix concrete, the average cost is $172 per yard, while a short-load of less than 10 yards costs less.The cost of concrete for a sidewalk is between $255 and $320, while a driveway or garage slab costs between $1,060 and $1,270.You can get cost estimates from concrete contractors.
Delivery up to 20 miles is included in the average cost of concrete.Pouring plain concrete costs $5 to $10 per square foot depending on the quality, while colored, stamped, or stained concrete can cost up to $18 per sq foot to install.
When pouring a concrete slab, patio, driveway, sidewalk, or adding steps, getting ready-mixed concrete delivered is quick and cost-effective.The local cost of concrete is one of the factors that can be used to estimate the costs of a concrete project.
Before hiring a concrete contractor, it's important to learn about the additional costs, delivery types, different concrete quality, and estimate how much concrete you need with our cost calculator.
The average cost of concrete is $108 per yard.Most pay between $119 and $147 per cubic yard for concrete delivery and pouring.It is enough to pour a 20x 24 driveway with a full 10-yard truckload.
It will add to your final cost if you get less than a full truckload.If your job site is more than 20 miles away from the mixing plant, you will have to pay an additional fee.
Depending on the concrete quality and project size, a 6 foot thick concrete slab can cost between $5 and $10 per square foot.Installation costs can range from $8 to $18 per square foot with decorative options.Most concrete jobs are measured in yards rather than square feet.
Depending on the mix, a full truckload of concrete costs between $1,169 and $1,444.A short load is added to your final price if it's less than a full truckload.
The average price for a ton of concrete is $50 to $75.The price for bulk concrete can vary depending on the strength of the job, and it can be measured and delivered in tons.
The most important factor in determining your final delivery cost is the amount of concrete you need.Add 5% to 10% to account for waste and spills when calculating how much concrete you need.
It's better to order more than you need.A cold seam between the concrete will cause you to start over if you pour twice.
If you want to find the number of yards required and the total cost for concrete delivery, you can use our concrete calculator.Adding a waste of 5% is not included.
Cement trucks don't make deliveries from house to house when you order concrete.Pre-mixed concrete is mixed according to the requirements of the job.The driver has about 90 minutes to deliver the load before the cement starts to set.
Whether you're a homeowner or a contractor, choosing the right type of concrete delivery is important.Your final cost depends on the amount of concrete ordered and the distance the truck needs to travel.The two most common types of concrete deliveries are ready-mix and short load.
Concrete costs between $119 and $147 per yard delivered.A full truckload of concrete costs about $172 per yard more than a partially filled truck.
Some concrete contractors will deliver between 1 and 11 yards of concrete in a single trip for small or residential projects.A service charge of about $60 to $110 is charged for mixing the concrete on-site using a freestanding mixer.You or your contractors are responsible for pouring the concrete at that point.
Short-load concrete deliveries are ideal for smaller projects.
Ready-mix concrete is pre-mixed in batches of 10 yards or more and can be delivered up to 20 miles.The quality of ready-mix concrete is higher than short load delivery because it is precisely prepared at a mixing plant.
The driver has about 90 minutes to deliver the load before it sets, and the concrete must be poured immediately upon arrival.
You have the option of hauling your own concrete up to 1 yard at a time.You will have to pay a flat fee of $120 per day if you want to rent a small concrete mixer that is attached to a trailer.
Concrete should be poured all at once if it is going to cause a cold seam that weakens the structure.If your project requires more than one yard of material, keep this in mind.
Before scheduling your concrete delivery, extra prep work such as grading, preparing a subbase, building forms, or installing reinforcements may be necessary.
A successful slab that does not crack depends on the base that lies beneath it.$60 per hour is the average cost for a tractor and operator.It is necessary to grade to make sure the water doesn't pool underneath the concrete and cause major cracking.The cost for clearing the land when building a house is between $1,150 and $3,680.
The gravel and sand that's delivered needs to be laid at a cost of $10 to $20 per yard.A sub base reduces the chance of shifting.The concrete will perform best if the foundation is stable.
Concrete is poured with stakes, nails, and form oil.The cost to install concrete edge forms for driveway and sidewalks is $2 to $3 per linear foot.
Concrete reinforcement wire mesh costs between $0.15 and $0.30 per square foot.Adding concrete reinforcements can help with poor soil conditions, prevent large cracks, and make your concrete project sound better.
The cost of ordering tan, brown, gray, or beige colored concrete will be added to the total cost.If a separate mixer is needed for multiple colors, there's an extra charge of $96 per day.In landscape design, colored concrete is popular.
Depending on the complexity of the design, staining or stamped concrete costs from $2 to $18 per square foot.There are different types of stamped concrete, from a smooth polish to geometric patterns.One color is applied to the concrete to make it look better.Multiple colors, stenciling, and border designs are included in advanced staining projects.
Concrete pumping for small residential jobs with a trailer-mounted pump and 200' hose costs a minimum of $125.A typical 4- to 5-hour minimum is required for larger concrete pouring jobs that require a 75' to 105' boom truck.
The trailer mounted pumps can move 15 yards of concrete per hour, while the boom truck can run 70 to 90 yards an hour.If you are pumping with a boom truck, add in at least an hour for equipment setup and an additional hour to clean up.
If no concrete pump trucks are available, renting an 80 ton crane to reach 100 feet costs $240 per hour, or about $20 per yard, plus travel costs each way.20 yards of concrete can be moved with a 4,000-pound bucket.
Pre-mixed concrete costs between $4.49 and $5.57 per 50-pound bag of light-weight and fast-setting concrete mix and is available at most home improvement stores.There are two types of pre-mixed concrete; a "no-mix" bag that requires the addition of water, and a concrete mixer that cures the cement.
Portland cement, which is used in concrete, mortar, stucco, and grout, is the most common type of cement.One kind of cement that resists water damage is one of the other types.The end result depends on the ratio of materials used to mix cement and aggregates.
Pre-mixed concrete bags are great for most small residential jobs.
Depending on your project's scope, you may need to rent equipment when you haul your own concrete, use pre-mixed bags, or get a short-load delivered.Renting a cement mixer on a trailer for small jobs costs between $120 and $390 per day.
The strength of concrete is measured by the number of pounds per square inch.The stronger the concrete, the more pounds per square inch.
It's best to use 3,000 PSI concrete for most residential projects such as walkways, driveways, and sidewalks.
Depending on the amount of concrete you need, there are different ways to buy it.Pre-mixed 50-pound bags of concrete can be purchased from your local home improvement store.It is possible to pour anything from a sidewalk to a driveway with the help of a ready-mix concrete delivery company.
Buying pre-mixed bags for $4.49 each and renting a concrete mixer for $120 per day is the cheapest way to buy concrete.The second best way is to buy a bulk truckload full for $1,169.
The dispatch department is responsible for setting up new deliveries when you call a concrete contractor.They will be able to tell you exactly how much concrete you need if you give them the dimensions of your project and what you are pouring.When ordering more than you need, be sure to ask if you have to use reinforced fiber for your project.
A concrete truck can deliver up to 20 miles with a capacity of 10 cubic yards.This is enough to pour a 20' x 24' concrete driveway and not have to pay for two deliveries.
A truckload of ready-mix concrete can be delivered for between $119 and $147 per cubic yard.If you order less than 10 yards of cement, there will be an additional fee.
In an 8-hour day, a crew of five can set forms and pour 40 to 50 yards of concrete directly from a ready-mix truck.It takes 60 to 90 minutes to pour a truckload of concrete.
The concrete must be poured within 1.5 hours after the water is added to the dry mixture.Concrete pumps move 15 yards per hour, boom trucks move 70 to 90 CY, and cranes move 20 CY.
If the water is calm, you can pour concrete in a hole.The cement paste that holds the sand and gravel together will be washed away if there is movement in the water.
Concrete can be poured over grass.It is a good idea to use a rototiller over the area until the vegetation is broken up.You want to make sure the grass is dead because it has been known to grow through concrete.
Cement is used in concrete.Aggregates and paste are used to make concrete.The aggregate is gravel or crushed stones and the paste is water and Portland cement.Portland cement is the term for the cement used in nearly every kind of concrete.
The ratio of cement to liquid in the concrete is referred to as a lean mix.It makes an excellent base layer for other types of concrete, even if it doesn't make a good driveway.Even out a rough terrain helps.
Most residential concrete pumping is done with 30-meter class booms which can pump as far as 100 feet, according to the American Concrete Pumping Association.Smaller concrete jobs use a trailer-mounted pump with a 200' hose, while large projects use an 80 ton crane to reach up to 100'.
A 75' to 105' boom pump truck costs between 140 and 190 per hour with a minimum of 4 hours.This does not cover the concrete or the certified driver.
Get at least 3 cost estimates and compare concrete contractors.They will inform you on the type of delivery you need, the best PSI to use for your project, what aggregate you want, and will send an accurate quote based on your requirements.
Related Posts:
- Concrete Calculator - How much concrete do I need?
- PDF Average Weight (psf) of Completed Walls using Concrete. Material WeightsDensity Of Concrete - How Much Does Concrete weigh?Nominal Weight of Standard Concrete...
- The Uses ofHydraulic Cement and How to ApplyCement has pictures.
- How much does a concrete slab cost per foot?