How many square feet can be had from a 60lb bag?
You can use the concrete calculator to figure out the number of bags of QUIKRETE® Concrete Mix, Mortar Mix or Fast-Setting Concrete you will need.The calculations are rounded up to the next highest bag.
All Spec Data sheets contain quantity and/or coverage calculations for QUIKRETE® products.
The number of bags you need to build a 4 inch or 6 inch slab is indicated by the calculator.All yields are approximate and do not allow for waste.
The calculator will tell you the number of bags of QUIKRETE® Mortar Mix you need to build your project.All yields are approximate and do not include allowances for waste and sub grade.
The post hole should be half of the above-ground post height.For a 6 feet above ground post, use a post with an overall height of 9 feet and place 3 feet in the ground.The number of 50 lbs will be indicated by the calculator.You need bags of QUIKRETE® Fast-Setting Concrete.
For 2 inch post diameter and 6 inch hole diameter.
For 3 inch post diameter and 9 inch hole diameter.
For 4 inch post diameter and 12 inch hole diameter.
For 6 inch post diameter and 18 inch hole diameter.
The calculator will tell you the number of bags of QUIKRETE ® Base Coat Stucco and Finish coat Stucco you need to build your wall.All yields are approximate and do not allow for deviations.
There is a number of 80 lbs.There are bags.
There is a number of 80 lbs.There are bags.
The number will be indicated by the calculator.You will need bags of QUIKRETE ® Veneer Stone Mortar to build your wall.All yields are approximate and do not allow for deviations.
There is a 1/2 inch bond coat.
There is a number of 80 lbs.There are bags.
The thick bond coat is directly over the wall.
There is a number of 80 lbs.There are bags.
The number of 50 lbs will be indicated by the calculator.QUIKWALL ® Surface Bonding Cement can be used to coat all sides of your wall.All yields are approximate and do not allow for deviations.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
The number will be indicated by the calculator.You will need tubes of QUIKRETE ® for your project.
The number of tubes is not known.
The number of tubes is not known.
The number of tubes is not known.
The number of tubes is not known.
The number will be indicated by the calculator.You will need QUIKRETE ® Polyurethane Mortar Joint Sealant or Mortar Repair for your project.
The number of tubes is not known.
The number of tubes is not known.
The calculator will show you the number of bags you need.The standard is 2 inch x 4 inch and 6 inch.For use with natural stone, usage will be different.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
PowerLoc® Jointing Sand can only be used under 1/2 inch.
10 percent more material is required for calculations based on 2 inch x 4inch x 8 inch paver applied over a square section.
The number of bags you need to fill the sand box will be shown by the calculator.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
There is a number of 50 lbs.There are bags.
The number of bags you need to cover the area will be indicated by the calculator.
The number of bags is.
The number of bags is.
The number of bags is.
The number of bags is.
The number of bags is.
The number of bags is.
The number of bags is.
How much do you need?Concrete slabs, Masonry Walls, Set Posts, Seal Cracks and Joints.
It's free to download!Homeowners and professionals have one-touch product and project information.