Washing machines are easy to install if you are replacing an old unit with a new one. As long as you already have the necessary plumbing ready, installing a washing machine only requires you to make the right drain and supply connections, level the washer and plug it in.
How long does a washer dryer installation take?
In terms of construction and labor, a good estimate is 3-5 days. The plumber will need a day, the electrician will need a day, and then you may need a day for relocations as well as to close up the wall. On day four, you'll be able to paint, once it's dry, install the new washer/dryer (day five).Dec 15, 2019